Home Page

Products

Specifications

Installation Guides

Distributors

Literature

CAD Drawings

Corporate Info

Contact Us

Standon Model C92 Installation Guide

Measure Distance from pipe to floor.
  1. Measure distance from bottom of supported pipe to finish floor elevation.
Cut Sch. 40 pipe 4" shorter.
  1. Cut a piece of Sch. 40 steel pipe 4" less than the previously measured distance.
Thread collar onto stud of saddle and insert Sch. 40 pipe into collar and base.
  1. Thread the collar assembly all the way onto the stud of the saddle assembly, then assemble the lower portion of the completed support, including the cut pipe section, and position under the pipe.
Turn collar counter-clockwise to tighten. Attach top saddle section with bolts.
  1. Turn the collar assembly counter-clockwise until the saddle fit's snuggly under the pipe. Install the upper saddle using supplied hardware. Tighten evenly on both sides. Insure that base assembly is positioned directly under piping system. Base may be secured to the floor with ½" wedge anchors if required.