Home Page
Products
Specifications
Installation Guides
Distributors
Literature
CAD Drawings
Corporate Info
Contact Us
|
Standon Model C92 Installation Guide
|
- Measure distance from bottom of supported pipe to finish floor elevation.
|
|
- Cut a piece of Sch. 40 steel pipe 4" less than the previously measured distance.
|
|
- Thread the collar assembly all the way onto
the stud of the saddle assembly, then assemble the lower portion of the
completed support, including the cut pipe section, and position under the pipe.
|
|
- Turn the collar assembly counter-clockwise
until the saddle fit's snuggly under the pipe. Install the upper saddle
using supplied hardware. Tighten evenly on both sides. Insure that base
assembly is positioned directly under piping system. Base may be secured
to the floor with ½" wedge anchors if required.
|
|
|